Spreading the footings
![epandage fibres](http://46.16.186.66/~syntheti/wp-content/uploads/2014/09/epandage_fibres.jpg)
Spread synthetic fibres or geotextile footings evenly across the sand layer.
Watering the surface
![arrosage fibres](http://46.16.186.66/~syntheti/wp-content/uploads/2014/09/arrosage_fibres.jpg)
Water the top layer to bring moisture into the footings and sand before mixing.
Mixing the surface
![melange fibres sol equestre](http://46.16.186.66/~syntheti/wp-content/uploads/2014/09/melange_fibres_sol_equestre-e1413888390923.jpeg)
Mix the surface with a power harrow to a depth of 3 inches (7 to 8 cm).
Maintenance
![entretien sol fibre](http://46.16.186.66/~syntheti/wp-content/uploads/2014/09/entretien_sol_fibr_.jpg)
To compact the surface, you can use a power harrow equipped with a roller.
An arena groomer is the perfect machine to use for maintenance.